PROJECTS: |
|
|
|
| |
|
|
|
|
| |
Woodruff Design Projects: |
|
|
|
| |
|
|
|
|
| |
Priority Envelope Production Facility, Nevada, IA |
|
|
|
| |
|
Images |
|
|
|
| |
|
Fast-Track Timeline |
|
|
|
| |
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
Trinity Regional Medical Center, Wound Center, Fort Dodge, IA |
|
|
|
| |
|
Remodel of existing space at the Wound Center into a new suite of
treatment rooms. Contract: $92,000
Completion Date: 11/02 |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
Woodruff
Construction Design-Build Projects: |
|
|
|
| |
|
|
|
|
| |
Gander Mountain Stores, Davenport, Cedar Rapids, IA |
|
|
|
| |
|
One of a chain of stores, this
building stores an inventory of hunting, fishing, and camping equipment.
It has a masonry and EIFS exterior with open-web steel joists supporting
the roof.
Contract: $1,764,530
Completion Date: 12/01 |
|
 |
|
| |
|
|
|
|
| |
Liberty Building, Ames, IA |
|
|
|
| |
|
This new building was a design-build project
located on 13th Street near I-35. It holds offices for several businesses.
There is a forced air heating & cooling system and EPDM roof.
Contract: $561,467
Completion Date: 05/01 |
|
 |
|
| |
|
|
|
|
| |
Buckaroos Production Facility, Nevada, IA |
|
|
|
| |
|
Design build, manufacturing plant and warehouse, forced air heat. Radiant
heat in manufacturing area. Contract:
$998,200
Completion Date: 07/01 |
|
 |
|
| |
|
|
|
|
| |
Slumberland Furniture, Fort Dodge, IA |
|
|
|
| |
|
This Slumberland
Furniture store has a brick façade on 3 sides to showcase its inventory of
products. The structure primarily consists of a pre-engineered metal
building. Contract: $729,002
Completion Date: 01/00 |
|
 |
|
| |
|
|
|
|
| |
Sun
Market & Deli, Fort Dodge, IA |
|
|
|
| |
|
The
Sun C-Store project includes a carwash, gas pumps, and a building selling
food items. The exterior of the building consists of EIFS, Varco Pruden
Fiberstone panels and masonry.
Contract: $1,270,826
Completion Date: 07/01 |
|
 |
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
Woodruff Construction Projects: |
|
|
|
| |
|
|
|
|
| |
Fort Dodge Public Library,
Fort Dodge, IA: |
|
|
|
| |
|
The
Fort Dodge Public Library is a 34,000 square foot building serving as the
centerpiece of the town square. Its structural steel frame is covered by a
brick and stone veneer. The facility has a shingled EPDM roof and a
vaulted ceiling system. A forced air and radiant heating system warms and
cools the building. Contract: $2.68
million
Completion: 11/00 |
|
 |
|
|
|
|
Photo by Renee Dietrich/The
Messenger |
|
| |
|
|
|
|
| |
Story County Justice Center, Nevada, IA: |
|
|
|
| |
|
The
Story County Justice Center contains 88,975 Square Feet of building space
on a site of 11.8 acres. Included in the facility is a courthouse,
sheriff’s office, jail housing (96 beds), jail support, lobby, and
building support. The exterior of the courthouse consists of brick,
hanging pre-cast panels, an aluminum curtain wall, and stainless steel
shingles. The lobby has horizontally sloped pre-cast panels as an exterior
canopy, interior free-standing pre-cast panels, marble exterior tile,
aluminum storefront, and granite panels. The HVAC system is comprised of
101 above-ceiling heat pumps supplied by a geothermal well system.
Architects Wells Kastner Schipper of Des Moines designed this project.
Contract: $11.6 million
Completion: 03/01/02 |
|
 |
|
| |
|
|
|
|
| |
Trinity Regional Medical Center Renovation, Fort Dodge, IA: |
|
|
|
| |
|
The renovation on
the top floor of Trinity Regional Hospital consisted of selective
demolition to existing offices and erecting new metal stud walls for a new
office layout. Created were a break room, large room with several work
stations, and meeting room. Contract:
$141,600
Completion Date: 09/02 |
|
 |
|
| |
|
|
|
|
| |
Trinity Regional Medical Center Renovation, Fort Dodge, IA: |
|
|
|
| |
|
Existing offices on the main floor of the hospital were remodeled into
newer offices providing information and resources for patients and
residents. Contract: $104,485
Completion Date: 12/00 |
|
 |
|
| |
|
|
|
|
| |
Trinity Regional Medical Center, Highland Park Center, Fort Dodge, IA: |
|
|
|
| |
|
A
former school building was renovated into offices and exam rooms. Special
treatments are conducted in this masonry-clad facility.
Contract: $355,690
Completion Date: 06/01 |
|
 |
|
| |
|
|
|
|
| |
Trinity Regional Medical Center, Fort Dodge, IA: |
|
|
|
| |
|
New
offices, open-heart surgical rooms, cath lab, and a cardiac rehabilitation
room were created during this renovation. It consisted of new metal stud
walls, casework, and finishes.
Contract: $1,610,000
Completion Date: 06/00 |
|
 |
|
| |
|
|
|
|
| |
Trinity Regional Medical Center, Pediatric Renovation, Fort Dodge,
IA: |
|
|
|
| |
|
The renovation of
the Pediatric area consisted of installing new carpet in a corridor and
finishes, doors, and casework for several patient rooms.
Contract: $125,400
Completion Date: 11/02
|
|
 |
|
| |
|
|
|
|
| |
13th Street AMOCO-Arby's, Ames , IA: |
|
|
|
| |
|
A new building
containing both an Arby’s restaurant and Amoco gas station were
constructed on 13th Street near I-35 in Ames. The exterior consists of
masonry and aluminum storefront.
Contract: $850,600
Completion Date: 05/00 |
|
 |
|
| |
|
|
|
|
| |
Mary Greeley Medical Arts Building, Ames, IA: |
|
|
|
| |
|
The Mary Greeley
Medical Arts Building is a 45,000 square foot, two-story addition to an
existing medical facility with a full basement and an in-ground pool below
basement level. The project construction elements included a concrete
detention basin, poured in place concrete foundation walls, a structural
steel skeleton with masonry shear wall construction, and pre-cast plank
with concrete topping on intermediate floors. The exterior is a
combination of brick and architectural panels and aluminum curtain wall
systems. The interior required extensive casework and medical finishes.
The parking lot includes an architectural decorative canopy attached to an
existing parking ramp. Woodruff received the ABC Award of Merit for this
project. Contract: $3.8 million
Completion: 10/01 |
|
 |
|
| |
|
|
|
|
| |
Mary Greeley Medical Center, Bliss Cancer Center, Ames, IA: |
|
|
|
| |
|
The Bliss Cancer Center Addition to Mary Greeley Medical Center is a
75,000 square foot structure with a basement and four floors above grade.
The exterior is comprised of architectural precast panels and a
curtainwall. Inside the building are a 6,000 square foot auditorium,
surgical rooms, patient rooms, exam rooms, and offices. A glycole system
provides radiant heating throughout the facility. A major challenge was
successfully undertaken by performing much of the construction while
maintaining an existing linkway between two existing buildings.
Contract: $11.35 million
Completion: 06/03 |
|
 |
|
| |
|
|
|
|
| |
Perry Community High School, Perry, IA: |
|
|
|
| |
|
The
Perry High School is a single-story 102,000 square foot facility,
including a 20,000 square foot gymnasium. The structure consists of
structural steel bar joists with a masonry exterior and standing seam
roof. A forced air HVAC system heats and cools the building.
Contract: $9.7 million
Completion: 11/03 |
|
 |
|
| |
|
|
|
|
| |
Staples Stores, Marshalltown, Ankeny, IA |
|
|
|
| |
|
The
Staples stores consist of metal buildings with brick and block exteriors.
Both projects were completed on schedule and on budget. |
|
 |
|
| |
|
|
|
|
| |
Buena Vista University Science Center, Storm Lake, IA |
|
|
|
| |
|
Follow the construction with the
Web Cam! |
|
|
|
| |
|
|
|
|
| |
Friendship Haven, Ford Dodge, IA |
|
|
|
| |
|
Follow the construction with the
Web Cam! |
|
|
|
| |
|
|
|
|
| |
Iowa State University, North Campus Chiller Plant, Ames, IA |
|
|
|
| |
|
Follow the construction with the
Web Cam! |
|
|
|
| |
|
|
|
|